|
The story on this page is a selection of interesting photos in the directory: 2024 Q3 and Q4.
The complete set of photos is available at: 2024 Q3 and Q4.
These clumps started to appear about a month after the footing was updated in late fall of 2024. They were not noticable at the time of the installation.
Note the white fibers which have started to appear all over the ring. The sheet of paper is a piece of copy paper for scale.
Scattered bits of fiber appear.
The footing update came in bags and was spread throughout the ring. The original Lite Stride surface was broken up by a machine that looks like a small roto-tiller. It took many passes to get the existing footing to loosen up.
More photos from
2024 Q3 and Q4. |