Conditions at the start of work. The Silt fence completely surrounds the 2010 Wetlands line about 10 feet from the line. The entire fence is dug into the ground 4 to 6 inches. The silt fence goes to the end of the old paddocks. Work starts digging out the old soil. This area is almost complete. Starting to gravel the access path. Access road is fully graveled. Much of the gravel is in. Gravel is about 6 to 8 inches lower than the base of the stalls. End of a days work. Stone Dust installation on the north side of the stalls is complete. There has been a day of rain since the stone dust installation. It is clear that nothing flows from the paddock into the pasture. Other photos taken at the same time that these photos were taken can be found in the directories that these photos came from. The photos in this story came from the following directories: bydate/2013q1q2 |
||||||||||||||||||||||||||||||||