Photo #4 shows the construction that was observed in 2009. The gravel area with the white stone goes under the wall at the left. Michael Newman saw work being performed on this area, including digging under the wall. This is where Michael Newman believes either a pipe was installed or a ditch was dug under the wall and filled with gravel.